Contact Us for PriceIn Stock — Usually Ships in 1–3 Business Days
About the PCB017
Dell part number PCB017 identifies the PCB017 - Dell 320-Watts 100-240V Power Supply for Presicion T1600 T1650, an enterprise-grade Power Supplies unit appropriate for data-center, server-room, and workstation deployment. Technical specifications include power of 320W, voltage of 240V. Typical use cases include in-place upgrades, EOL replacement under existing OEM service contracts, lab/test environments, and refurbished-rebuild programs. Pro Disk Network supplies the PCB017 to US business buyers. Each unit ships from the US with dispatch in 1–3 business days. 90-day Pro Disk Network functional warranty included; free US ground shipping on orders over $150.
The PCB017 is a Dell power supplies component with power 320W, voltage 240V. Pricing on the PCB017 is quote-based — email sales@prodisknetwork.com or use our live chat for a quote.
The PCB017 is a Dell power supplies part. Email sales@prodisknetwork.com with your system make, model, and serial number - we will confirm compatibility and ship in 1–3 business days if in stock.
How fast does the PCB017 ship?
If in stock, the PCB017 ships in 1–3 business days. Bulk and pallet orders may need extra handling time; we confirm the ship date with your order.
The PCB017 is deployed by US enterprises, MSPs, government, and education customers across multiple infrastructure scenarios. Below are the most common deployment patterns Pro Disk Network sees in real-world orders.
Redundant Server Power — N+1 PSU configurations in dual-feed racks — order matched units in pairs to maintain hot-spare semantics.
Rack PDU Replacement — Vertical or horizontal PDUs in cabinet retrofits. Metered or switched models for granular outlet-level control.
Branch UPS — Office or remote site UPS. 1500–3000 VA covers most server-rack mini-deployments with 5–15 minute runtime.
Datacenter UPS Module — Online double-conversion UPS for production server rooms. Match VA rating to total connected load + 30% headroom.
What is the PCB017?
The PCB017 is a Dell server power supply unit with power 320W and voltage 240V, manufactured by Dell. Pro Disk Network ships this part new and certified-refurbished from our US warehouse with dispatch in 1–3 business days, backed by a 30-day return guarantee.
Pros & Cons of PCB017
Pros
US shipping in 1–3 business days reduces production downtime
Cons
Wattage headroom should be sized at 70-80% sustained load
Cable harness sold separately on certain chassis
OEM warranty does not transfer with refurbished units
Frequently Asked Questions about PCB017
Is the PCB017 a genuine Dell part?
Yes. Pro Disk Network sources every PCB017 as factory-original Dell inventory. New units arrive sealed in OEM packaging; refurbished units are pulled from decommissioned Dell servers, surface-tested, and re-warranted by Pro Disk Network for 90 days.
Will the PCB017 fit my system?
The PCB017 is a Dell power supplies part. Email sales@prodisknetwork.com with your system make, model, and serial number - we will confirm compatibility and ship in 1–3 business days if in stock.
How fast does the PCB017 ship?
If in stock, the PCB017 ships in 1–3 business days. Bulk and pallet orders may need extra handling time; we confirm the ship date with your order.
What is the warranty on the PCB017?
New PCB017 units carry the full Dell manufacturer warranty (typically 1 to 5 years depending on product line). Refurbished and bulk-OEM units include a Pro Disk Network advance-replacement warranty (90 days refurbished). DOA replacement is free within 30 days of receipt.
Do you offer bulk pricing for the PCB017?
Email sales@prodisknetwork.com with the quantity and target ship date for a quote.
PSU Sizing: Connected Load, Efficiency Curves, and N+1 Redundancy
Sizing the PCB017 or its replacement starts with calculating connected load. Add up the nameplate wattage of CPUs, GPUs, drives, fans, and add-in cards under maximum sustained load. Idle is irrelevant; peak sustained is what matters. Size the PSU at 60-80% of nameplate load for best efficiency — modern Platinum/Titanium PSUs hit peak efficiency at 50% load and degrade above 80%.
AC Input, Phase Balancing, and Datacentre Power Best Practices
For UPS-fed servers, confirm the UPS output waveform is compatible with the PCB017's input. Modern PSUs accept both sine-wave and high-quality simulated sine-wave inputs, but older or stepped-approximation UPS outputs can cause buzzing or premature PSU failure. When in doubt, use double-conversion online UPS units.